PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Pouring concrete at Elev. 1,2,3 (4th Floor) Facing South (800x600).jpg Pouring concrete at Stair -4 (4th Floor) Facing East (800x600).jpg UCFC Site Facing North-West (800x600).jpg
Previous page UCFC Site Facing North-West (800x600)
UCFC Site Facing North-West (800x600)